三明钢铁厂110M/S高线旋流井施工方案的选择 |
| |
引用本文: | 戴跃军.三明钢铁厂110M/S高线旋流井施工方案的选择[J].福建建材,2006(3):75-76. |
| |
作者姓名: | 戴跃军 |
| |
作者单位: | 三明市建设工程质量监督站,福建三明365001 |
| |
摘 要: | 针对三明钢铁厂110M/S高线旋流井工程施工中的周边环境、地质、水文等实际情况,本文对比了采用地下连续墙技术与沉井技术优缺点,并选择了最优施工方案。
|
关 键 词: | 高线旋流井 地下连续墙 沉井 |
The choice of the construction project of 110M/S hight-speed rotational flow well of Sanming Steel Co.,Itd. |
| |
Authors: | DAI Yue-jun |
| |
Affiliation: | DAI Yue-jun |
| |
Abstract: | According to the circumstance, hydrologic and geologic conditions of 110m/shight-speed rotational flow well of sanming steel co. ltd, the paper contrasted the merit and shortcoming of diaphragm wall technology and the sink wall technology, and chosed the superior construcion proiect. |
| |
Keywords: | hight-speed rotational flow well diaghragm wall sink wall |