首页 | 本学科首页   官方微博 | 高级检索  
     

基于上限理论的软土基坑抗隆起稳定分析方法
引用本文:秦会来,陈祖煜,刘立鹏. 基于上限理论的软土基坑抗隆起稳定分析方法[J]. 岩土工程学报, 2012, 34(9): 1611-1619
作者姓名:秦会来  陈祖煜  刘立鹏
作者单位:1. 中国建筑股份有限公司技术中心,北京 101300;2. 中国水利水电科学研究院岩土工程研究所,北京 100048
基金项目:中建股份科技研发课题(CSCEC-2010-Z-01);铁道部铁路客站关键技术研究重点课题(2009G007-B)
摘    要:多块体上限法是当前岩土工程稳定性问题求解的一种严格、高效、简便且实用的方法。依据多块体上限法求解岩土工程稳定性问题的一般模式,通过对软黏土基坑抗隆起稳定性问题的适当简化,从而提出了基于极限分析上限理论的黏土基坑抗隆起稳定分析新方法。为适应国内外深基坑工程实践的现状,分别给出了土体强度指标为固结不排水剪及不固结不排水剪时的上限法理论方程中内能耗散项的计算方法。给出了所提出新方法求解实现的详细过程,并编制了该方法的计算程序,从而使所提出的方法能够直接应用于国内外的工程实践。详细分析总结了支护墙体刚度、支护墙体入土深度、基坑开挖深度、土体强度等影响因素对抗隆起稳定性的影响及规律,最后通过具体工程实例的计算及对比说明了该方法的合理性及实用性。

关 键 词:极限分析  多块体上限法  基坑抗隆起  
收稿时间:2012-10-10

Basal stability analysis for excavations in soft clay based on upper bound method
QIN Hui-lai,CHEN Zu-yu,LIU Li-peng. Basal stability analysis for excavations in soft clay based on upper bound method[J]. Chinese Journal of Geotechnical Engineering, 2012, 34(9): 1611-1619
Authors:QIN Hui-lai  CHEN Zu-yu  LIU Li-peng
Affiliation:1. Technical Center, China State Construction Engineering Corporation, Beijing 101300, China; 2. Department of Geotechnical Engineering, China Institute of Water Resources and Hydropower Research, Beijing 100048, China
Abstract:The multi-block upper bound method is a good choice for the stability analysis problems in the geotechnical engineering.It is simple,highly effective and of rigorous theoretical basis.According to the usage process of the multi-block upper bound method,some simplifications are made for the basal stability analysis of braced cuts in clay.After the simplifications,a new method based on the upper bound method is proposed for the basal stability analysis,and the detailed calculation process is discussed.Considering different soil strength indices used in practice,the calculation methods for consolidated-undrained strength and unconsolidated-undrained strength are put forward respectively,and they can be used in practice at home and abroad.Several calculations are presented to analyze the effects of some important factors on the basal stability safety.Finally,a real excavation case is calculated and comparisons are made with the methods recommended in the codes to examine the proposed method.
Keywords:limit analysis  multi-block upper bound method  basal stability
本文献已被 CNKI 等数据库收录!
点击此处可从《岩土工程学报》浏览原始摘要信息
点击此处可从《岩土工程学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号