首页 | 本学科首页   官方微博 | 高级检索  
     

特殊地质条件深基础地下连续墙施工应用研究
引用本文:肖桂元,郭维君,陈学军. 特殊地质条件深基础地下连续墙施工应用研究[J]. 地下空间与工程学报, 2012, 8(3): 615-620
作者姓名:肖桂元  郭维君  陈学军
作者单位:1.同济大学道路与交通工程教育部重点实验室,上海 201804;2.桂林理工大学土木与建筑工程学院,广西 桂林 541004;3.广西建筑检测与试验重点实验室,广西 桂林 541004;4.重庆市地质矿产研究院,重庆 400042
基金项目:国家自然科学基金青年基金,国家自然科学基金青年基金,广西自然科学基金,广西区重点实验室项目
摘    要:为了有效解决软土地区复杂地质条件情况下深基础地下连续墙防护工程经常遭遇槽壁坍塌及容易引发透水性事故等施工难题,本文针对复杂地质情况、周围建筑物的稳定性安全要求及管线影响等众多制约因素,结合深圳某地下工程施工实践进行经验总结,提出特殊地质条件下的深基础地下连续墙的施工参数及施工工艺控制措施,分析和归纳得出控制好材料质量、泥浆护壁及控制导墙和导坑的施做工艺是施工成败的关键的结论。为今后类似工程提供借鉴。

关 键 词:地下连续墙  深基础  施工控制  
收稿时间:2011-12-26

Research of Diaphragm Wall Construction in Deep Foundation under Special Geological Conditions
Xiao Guiyuan , Guo Weijun , Chen Xuejun. Research of Diaphragm Wall Construction in Deep Foundation under Special Geological Conditions[J]. Chinese Journal of Underground Space and Engineering, 2012, 8(3): 615-620
Authors:Xiao Guiyuan    Guo Weijun    Chen Xuejun
Affiliation:1.Key Laboratory of Road and Traffic Engineering of Ministry of Education, Tongji University, Shanghai 201804,China;2.College of Civil and Architectural Engineering,Guilin University of Technology, Guilin, Guangxi 541004,China; 3. Guangxi Key Laboratory of Building Inspection and Test,Guilin,Guangxi 541004,China;4.Chongqing Instituteof Geology and Mineral Resources,Chongqing 400042,China
Abstract:In order to effectively solve the problems about deep diaphragm wall protection which often suffers the collapse of vessel wall and accident in construction under complex geological conditions of soft soil foundation,according to complex geological conditions,the stability safety requirements of surrounding buildings and pipelines and other restricting factors,combined with the experience of an underground construction in Shenzhen,this paper comes up with the construction parameters and measures to control the construction quality of the continuous wall beneath special geological conditions,and puts forward the verdict that to dominate the quality of materials,mud protection and the guide walls’ drift process is the key to construction success through summarizing and analyzing,thus to provide a reference for future similar projects.
Keywords:deep diaphragm wall  deep foundation  construction control
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《地下空间与工程学报》浏览原始摘要信息
点击此处可从《地下空间与工程学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号