摘    要:对李家峡水电站双排机组(2号机和3号机)的运行稳定性作了介绍,对引起振动的原因进行了简要分析,提出了提高双排机组运行稳定性应采取的措施。

关 键 词:双排机组  运行  稳定性

Operation stability analysis of double-row arranged units with unit capacity of 400 MW
ZHANG Gui-lin.Operation stability analysis of double-row arranged units with unit capacity of 400 MW[J].Northwest Water Power,2011(2):57-61.
Authors:ZHANG Gui-lin
Affiliation:ZHANG Gui-lin(Lijiaxia Operation Department of Huanghe Hydropower Development Co.Ltd,Jianzha 811900,China)
Abstract:This paper presents the operation stability of double-row arranged units(Units 2 3) of Lijiaxia hydropower station,briefly analyzes the reason of vibration,and proposes the necessary measures for increasing the operation stability of units in double-row arrangement.
Keywords:units in double-row arrangement  operation  stability