东升庙矿柱回采顺序研究
引用本文:张永亮.东升庙矿柱回采顺序研究[J].矿业研究与开发,2011(2):4-7.
作者姓名:张永亮
作者单位:西北矿冶研究院;
摘    要:对东升庙铅锌矿矿柱的形成与分布进行分析和调查.随着矿柱的回采,空区暴露面积增大,其冒落形成的空气冲击波将会造成巨大的危害.运用空气冲击波理论,计算了采空区临界冒落面积,得出空区允许的最大跨度为159m;对不同回采顺序的矿柱应力分布进行了分析,最终提出了从中央向端部推进的矿柱回采顺序.

关 键 词:矿柱回采  空气冲击波  平衡拱  临界冒落面积  回采顺序

Study on Recovery Sequence of Ore Pillar in Dongshengmiao Lead-zinc Mine
ZHANG Yongliang.Study on Recovery Sequence of Ore Pillar in Dongshengmiao Lead-zinc Mine[J].Mining Research and Development,2011(2):4-7.
Authors:ZHANG Yongliang
Affiliation:ZHANG Yongliang(Northwest Institute of Mining and Metallurgy,Baiyin,Gansu 730900,China)
Abstract:The occurrence and distribution of ore pillars was analyzed and investigated.With the recovery of ore pillars and the increase of exposed area in mined-out areas,rock caving may happen,and air shock wave caused by rock caving may result in great harm.The critical collapse area of mined-out area was calculated by use of shock wave theory,and the calculated maximum of permissible span of mined-out area is 159 m.The distributions of pillar stress for different recovery sequences of pillars were analyzed.The pi...
Keywords:Recovery of ore pillars  Air shock wave  Balance arch  Critical collapse area  Recovery sequence  