首页 | 本学科首页   官方微博 | 高级检索  
     

忠县长江大桥斜拉索施工工艺
引用本文:吴小锋,姚波. 忠县长江大桥斜拉索施工工艺[J]. 山西建筑, 2009, 35(18)
作者姓名:吴小锋  姚波
作者单位:1. 中铁一局桥梁公司,重庆,401121
2. 重庆高速公路发展有限公司垫利分公司,重庆,401121
摘    要:根据某双塔双索面混凝土斜拉桥工程概况,对斜拉索挂设、张拉及索力调整等关键施工工艺作了介绍,并总结了相应的施工注意事项,以提高斜拉索施工质量,确保大桥的正常运营.

关 键 词:斜拉桥  斜拉索  挂设  张拉  索力调整  施工工艺

The Zhong county the Changjiang River Bridge inclined pull cable construction craft
WU Xiao-feng,YAO Bo. The Zhong county the Changjiang River Bridge inclined pull cable construction craft[J]. Shanxi Architecture, 2009, 35(18)
Authors:WU Xiao-feng  YAO Bo
Abstract:According to two towers and two cable concrete inclined pull bridge engineering general situation,to inclined pull cable hang establish,the piece pull and the cable stress adjusts etc.the key the construction the craft makes introduction,the paper tallies up the homologous construction announcements,to increase the inclined pulling cable construction quality,insuring the big bridge normal operation.
Keywords:inclined pull bridge  inclined pull cable  hang establish  the piece pull  the cable stress adjust  the construction craft  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号