首页 | 本学科首页   官方微博 | 高级检索  
     

应用不确定度管理程序PUMA对方箱垂直度测量的实例分析
引用本文:马浩慧.应用不确定度管理程序PUMA对方箱垂直度测量的实例分析[J].上海计量测试,2008,35(6):11-13.
作者姓名:马浩慧
作者单位:上海市计量测试技术研究院
摘    要:不确定度管理程序PUMA能使几何量测量的成本更经济和实用。该文选择了方箱垂直度测量,目的在满足测量不确定度与其最大允许误差的绝对值MPE之比小于或非常接近1:3的要求时,寻找一种成本合理的测量方法。

关 键 词:PUMA  测量不确定度  垂直度

Analysis of PUMA's applying
Ma Haohui.Analysis of PUMA''s applying[J].Shanghai Meassurement and Testing,2008,35(6):11-13.
Authors:Ma Haohui
Affiliation:Ma Haohui (Shanghai Institute of Measurement and Testing Technology)
Abstract:PUMA is defined as program of uncertainty management, which refers to the measurement cost even can make geometrical calibration economical and practical. The thesis chooses measuring verticality of steel box, which aims to find a meter way cost just reasonable ,as long as the program can reach the requirement as the uncertainty less than and close to 1/3 of MPE.
Keywords:PUMA
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号