首页 | 本学科首页   官方微博 | 高级检索  
     

海南酒店项目BIM-5D精细化管理研究
引用本文:钟炜, 张凯乐, 乜凤亚. 海南酒店项目BIM-5D精细化管理研究[J]. 土木建筑工程信息技术,2017, 9(2): 24-29.doi: 10.16670/j.cnki.cn11-5823/tu.2017.02.04
作者姓名:钟炜  张凯乐  乜凤亚
作者单位:1.天津理工大学管理学院, 天津 300384; 2.中国建筑第八工程局天津公司,天津 300384
基金项目:国家社科基金项目“政府主导实施BIM情境下公建项目多利益方协同与反腐治理研究”(项目编号:15BGL173);天津市科技重大专项与工程项目“天津市BIM共享服务信息平台技术研究”(项目编号:15ZXHLSF00040)国家社科基金项目“政府主导实施BIM情境下公建项目多利益方协同与反腐治理研究”项目编号:15BGL173天津市科技重大专项与工程项目“天津市BIM共享服务信息平台技术研究”项目编号:15ZXHLSF00040
摘    要:本研究以精细化管理理念为指导,结合国内外大型建设项目中BIM技术在设计阶段和施工阶段的应用,从业主视角深入发掘除碰撞检查、综合布局优化、施工漫游及施工模拟等BIM应用点之外,基于BIM-5D技术在投资管控等关键节点的新型并联工作模式,旨在探索企业基于BIM技术进行流程再造以实现精细化建造在成本管理等方面的创新应用,提高工作流程转化的效率,节约交易成本,为企业新建项目BIM技术的应用提供可参考的实施方案。

关 键 词:BIM-5D   精细化管理   投资管控   流程再造

Research on BIM-5D Fine Management in Hainan Hotel Project
Zhong Wei,Zhang Kaile,Nie Fengya. Research on BIM-5D Fine Management in Hainan Hotel Project[J]. Journal of Information Technology in Civil Engineering and Architecture, 2017, 9(2): 24-29. DOI: 10.16670/j.cnki.cn11-5823/tu.2017.02.04
Authors:Zhong Wei  Zhang Kaile  Nie Fengya
Affiliation:1.School of Management, Tianjin University of Technology, Tianjin 300384, China; 2.Tianjin Company, China Construction 8th Engineering Division, Tianjin 300384, China
Abstract:The research is guided by the concept of fine managementphilosophy.Considering the application of BIM technology in domestic and foreign large-scale construction projects in the design and construction stages, this paper takes the perspective of the owner to explore in depth in addition to collision detection, comprehensive layout optimization, construction and construction simulation for a new parallel operation mode of investment, management and control based on BIM-5D technology in key nodes, additional to existing BIM applications like collision detection, comprehensive layout optimization, construction roaming, construction simulation, etc.This paper also aims at exploring enterprise′s progress reengineering based on BIM for innovative applications in areas like fine construction for cost management, to improve workflow transformation efficiency, as well as to save transaction costs, for providing an implementation reference scheme for the BIM application in new project of the enterprise.
Keywords:BIM-5D   Fine Management   Investment Management   Process Reengineering
本文献已被 CNKI 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号