首页 | 本学科首页   官方微博 | 高级检索  
     

板式构件加固衬砌裂缝的模型试验研究
引用本文:龚伦 杨淋亦 仇文革 敖维林 王希元. 板式构件加固衬砌裂缝的模型试验研究[J]. 土木工程学报, 2017, 50(Z1): 47-52
作者姓名:龚伦 杨淋亦 仇文革 敖维林 王希元
作者单位:1. 西南交通大学, 四川成都 6100312.中国电建集团华东勘测设计研究院有限公司, 浙江杭州 311100
摘    要:为了得到板式构件对隧道衬砌裂缝的加固效果,采用模型试验方法,对带裂缝衬砌加固前后的力学特性进行研究。通过对衬砌加固前后位移、接触应力、结构内力和破坏形态的考察,得研究成果:隧道产生裂缝后,发生位移早且位移量增大、承载能力降低,并将衬砌的破坏由墙脚压溃转变为裂缝处拉裂|通过板式构件加固后,产生变形较晚且位移量减小38.5%,板式构件有效的改善整个结构的受力状态并阻止裂缝的发展,显著提高了整体结构的抵抗变形能力和承载能力|既有衬砌承担的轴力占合力的73.9%,其仍然是加固后组合结构的承载主体|若采用合适的板式构件进行加固,其承载力完全可以恢复到甚至超过完好衬砌的水平。

关 键 词:模型试验   板式构件   衬砌裂缝   有效改善   受力状态  

Study on reinforced cracking lining of plate members by model test
Gong Lun Yang Linyi Qiu Wenge AoWeilin WangXiyuan. Study on reinforced cracking lining of plate members by model test[J]. China Civil Engineering Journal, 2017, 50(Z1): 47-52
Authors:Gong Lun Yang Linyi Qiu Wenge AoWeilin WangXiyuan
Affiliation:1. Southwest Jiaotong University, Chengdu 610031, China2. HydroChina huadong Engineering Corporation, Hangzhou 311100, China
Abstract:In order to study the reinforcement effect of the plate members on the lining cracks, The mechanical properties of the crack lining before and after reinforcement were studied by means of model test. Through the investigation of the displacement, contact stress force and failure mode of the lining before and after reinforcement, the research results showed: After the cracks are generated in the tunnel, the displacement occurs early and the displacement increases, the carrying capacity decreases, and the damage of the lining is reduced from the footwall crushing to the crack. After the plate member is reinforced, the deformation is delayed and the displacement is reduced by 38.5%. The plate member is effective in improving the stress state of the whole structure and preventing the development of the crack, which greatly improves the resistance and deformation capacity of the whole structure. The bearing capacity of the lining is 73.9% of the force, which is still the main body of the composite structure after reinforcement. If the reinforcement is carried out with the appropriate plate member, the bearing capacity can recovered or exceed the level of the perfect lining.
Keywords:model test   plate members   lining cracks   effective improvement   forced state  
本文献已被 CNKI 等数据库收录!
点击此处可从《土木工程学报》浏览原始摘要信息
点击此处可从《土木工程学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号