采用整体推移方法更换炼铁厂2#高炉热风炉热风管道
引用本文:陈刚. 采用整体推移方法更换炼铁厂2#高炉热风炉热风管道[J]. 湖南有色金属, 2005, 21(3): 49-50
作者姓名:陈刚
作者单位:湖南华菱湘潭钢铁有限公司,湖南,湘潭,411101
摘    要:在高炉热风炉热风管道更换施工中采用整体推移方法,提高了检修速度和质量。

关 键 词:高炉热风炉  热风管  平移更换
文章编号:1003-5540(2005)03-0049-02
修稿时间:2005-01-31

Changing the Hot Air Stove Pipes of NO.2 Blast Furnace at Ironmaking Plant by Translating the Whole Pipes
CHEN Gang. Changing the Hot Air Stove Pipes of NO.2 Blast Furnace at Ironmaking Plant by Translating the Whole Pipes[J]. Hunan Nonferrous Metals, 2005, 21(3): 49-50
Authors:CHEN Gang
Abstract:During the construction of hot air stove pipe replacement of NO.2 blast furnace, both the overhauling speed and the work quality have been improved by using the method that the whole blast pipes are translated in parallel.
Keywords:hot air stove of blast furnace  hot air stove pipe  pipe replacement by parallel translation