首页 | 本学科首页   官方微博 | 高级检索  
     

地浸作业中浸出结束点的确定
引用本文:苏学斌,王海峰. 地浸作业中浸出结束点的确定[J]. 铀矿冶, 1999, 18(2): 85-89
作者姓名:苏学斌  王海峰
作者单位:核工业铀矿开采研究所,湖南,421001
摘    要:在地浸作业中,合理选择浸出结束点,关系到地浸企业的经济效益。阐述了确定浸出结束点传统方法的不足,并结合实例介绍了投入产出分析浸出结束点的方法

关 键 词:地浸作业  浸出结束点  投入产出
修稿时间:1998年1月8日)

DETERMIANTION OF ENDING POINT FOR IN-SITU LEACHING OPERATION
Su Xuebin,Wang Haifeng. DETERMIANTION OF ENDING POINT FOR IN-SITU LEACHING OPERATION[J]. Uranium Mining and Metallurgy, 1999, 18(2): 85-89
Authors:Su Xuebin  Wang Haifeng
Abstract:To reasonably choose ending point for leaching will influence the economic benefit of enterprise during in situ leaching operation.The weakness of traditional methods used for determination of leaching ending point was described in the paper,and the method of input output analysis is also introduced,which the authors proposed from case study for determining ending point of leaching.
Keywords:In situ leaching operation Ending point of leaching Input output
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号