煤矿采动影响区输电线路设计 |
| |
引用本文: | 吴晓锋,乔菲菲,孙庆刚. 煤矿采动影响区输电线路设计[J]. 河北电力技术, 2013, 0(6): 17-18,25 |
| |
作者姓名: | 吴晓锋 乔菲菲 孙庆刚 |
| |
作者单位: | [1]河北省电力勘测设计研究院,石家庄050031 [2]北方工程设计研究院有限公司,石家庄050051 [3]河北省审计厅,石家庄050011 |
| |
摘 要: | 根据采动影响区地表塌陷的特点和规律,结合宁东一山东工程河北段情况,从避让采动影响区、塔位和塔型的选择、基础结构的处理等方面分析输电线路经过煤矿采动影响区内采取的具体设计措施,说明采取措施后的运行效果。
|
关 键 词: | 输电线路 采动影响区 塌陷 |
Design on Transmission Line Routed in Emptied Area of Coal Mine |
| |
Abstract: | With the characteristic and rules of the goaf areas sink, combined with Ningdong--Shandong construction Hebei part, proposes the design measures which be taken in this transmission line design from preventing goal areas, cho- sen of tower location and tower type, base structure disposal, and indicates that the operation effects after measures. |
| |
Keywords: | transmission lines emptied areas sink |