Pushing requirements changes through to changes in specifications |
| |
Authors: | Lan LIN Jesse H. POORE |
| |
Affiliation: | (1) Department of Electrical Engineering and Computer Science, University of Tennessee, Knoxville, TN 37996-3450, USA |
| |
Abstract: | Requirements changes can occur both during and after a phase of development for a variety of reasons, including error correction and feature changes. It is difficult and intensive work to integrate requirements changes made after specification is completed. Sequence-based specification was developed to convert ordinary functional software requirements into complete, consistent, and traceably correct specifications through a constructive process. Algorithms for managing requirements changes meet a very great need in field application of the sequence-based specification method. In this paper we propose to capture requirements changes as a series of atomic changes in specifications, and present polynomial-time algorithms for managing these changes. The algorithms are built into the tool support with which users are able to push requirements changes through to changes in specifications, maintain old specifications over time and evolve them into new specifications with the least amount of human interaction and rework. All our change algorithms are supported by rigorous mathematical formulation and proof of correctness. The application example is a safe controller. Software Quality Research Lab, Department of Electrical Engineering and Computer Science, University of Tennessee at Knoxville, http://www.cs.utk.edu/sqrl/ |
| |
Keywords: | requirements change management sequence-based software specification changing state machine diagrams Mealy machine automaton |
本文献已被 万方数据 SpringerLink 等数据库收录! |
|