首页 | 本学科首页   官方微博 | 高级检索  
     


Pushing requirements changes through to changes in specifications
Authors:Lan LIN  Jesse H. POORE
Affiliation:(1) Department of Electrical Engineering and Computer Science, University of Tennessee, Knoxville, TN 37996-3450, USA
Abstract:Requirements changes can occur both during and after a phase of development for a variety of reasons, including error correction and feature changes. It is difficult and intensive work to integrate requirements changes made after specification is completed. Sequence-based specification was developed to convert ordinary functional software requirements into complete, consistent, and traceably correct specifications through a constructive process. Algorithms for managing requirements changes meet a very great need in field application of the sequence-based specification method. In this paper we propose to capture requirements changes as a series of atomic changes in specifications, and present polynomial-time algorithms for managing these changes. The algorithms are built into the tool support with which users are able to push requirements changes through to changes in specifications, maintain old specifications over time and evolve them into new specifications with the least amount of human interaction and rework. All our change algorithms are supported by rigorous mathematical formulation and proof of correctness. The application example is a safe controller. Software Quality Research Lab, Department of Electrical Engineering and Computer Science, University of Tennessee at Knoxville, http://www.cs.utk.edu/sqrl/
Keywords:requirements change management  sequence-based software specification  changing state machine diagrams  Mealy machine  automaton
本文献已被 万方数据 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号