首页 | 本学科首页   官方微博 | 高级检索  
     

某斜拉桥施工过程中塔梁检测的应用研究
引用本文:孙建华,杨龙飞. 某斜拉桥施工过程中塔梁检测的应用研究[J]. 国外建材科技, 2008, 29(1): 80-83
作者姓名:孙建华  杨龙飞
作者单位:中铁大桥局集团第五工程有限公司,九江,332001
摘    要:斜拉桥作为一种常见的大跨度桥梁结构形式,在施工中一般应对其斜拉索以及塔梁进行检测,并对相应的施工过程进行控制,以保证施工的顺利进行,确保施工质量。文中以某斜拉桥的施工为背景,较为详细地讨论了斜拉桥钢筋混凝土桥塔、主梁检测断面的布置、检测工作的内容以及施工质量检测标准,以期为同类工程的检测提供参考。

关 键 词:斜拉桥  桥塔  主梁  检测
收稿时间:2007-10-31
修稿时间:2007-10-31

Research on the Testing of the Bridge Tower and Main Beam in the Construction of a Cable-stayed Bridge
SUN Jian-hua,YANG Long-fei. Research on the Testing of the Bridge Tower and Main Beam in the Construction of a Cable-stayed Bridge[J]. Science and Technology of Overseas Building Materials, 2008, 29(1): 80-83
Authors:SUN Jian-hua  YANG Long-fei
Abstract:As a common type of great-span bridge structure in the construction of cable-stayed bridge, testing of the cable, tower and beams should be carried out in a general way to control the construction of the bridge and ensure the quality of the bridge. The arrangement of testing cross-sections of the tower and beams, the work of the testing and the criterions are studied in detail. The results can provide uses for reference and consult in other similar engineering.
Keywords:cable-stayed bridge   bridge tower   main beam   testing
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号