首页 | 本学科首页   官方微博 | 高级检索  
     

风电场中压电缆终端施工工艺要点
引用本文:徐党国,吴刚,李大卫.风电场中压电缆终端施工工艺要点[J].华北电力技术,2012(2):69-70.
作者姓名:徐党国  吴刚  李大卫
作者单位:华北电力科学研究院有限责任公司,北京,100045
摘    要:风力发电场大量使用中压电缆,但目前电缆终端故障率较高,且一般为施工工艺控制不严所致,文章从中压电缆终端工艺控制出发,提出相应各阶段的工艺要点。

关 键 词:风电场  中压电缆  电缆终端  故障

Construction Process Points of Medium-voltage Cable Termination in Wind Farm
Xu Dang-guo , Wu Gang , Li Da-wei.Construction Process Points of Medium-voltage Cable Termination in Wind Farm[J].North China Electric Power,2012(2):69-70.
Authors:Xu Dang-guo  Wu Gang  Li Da-wei
Affiliation:( North China Electric Power Research Institute Co. Ltd. ,Beijing 100045 ,China)
Abstract:The wind farms use extensively medium-voltage cable, but cable terminal failure rate is high, usually due to inadequate control of the construction process, from the aspect of medium vohage cable termination process control, the corresponding process points for each stage are presented.
Keywords:wind farm  medium-voltage cable  cable termination  failure
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号