杨柳煤矿风井长期维护冻结技术实践
引用本文:李新德,杨兴全.杨柳煤矿风井长期维护冻结技术实践[J].煤炭技术,2007,26(6):94-96.
作者姓名:李新德  杨兴全
作者单位:1. 淮北矿业集团公司,杨柳煤矿,安徽,淮北,235000
2. 中煤国际工程集团南京设计研究院,南京,210000
摘    要:杨柳煤矿风井井筒长期维护冻结工程历时104天,属全国首例,文章介绍了长期维护冻结所采取的措施及收到的效果,为井筒冻结工程提供了经验。

关 键 词:长期维护  冻结工程  实践
文章编号:1008-8725(2007)06-0094-03
修稿时间:2007-03-16

Practice of Long-term Maintenance Freezing Technology in the Air Shaft of Yangliu Coal Mine
LI Xin-de,YANG Xing-quan.Practice of Long-term Maintenance Freezing Technology in the Air Shaft of Yangliu Coal Mine[J].Coal Technology,2007,26(6):94-96.
Authors:LI Xin-de  YANG Xing-quan
Affiliation:1. Yangliu Coal Mine, Huaibei Mining industry Group Company, Huaibei 235000, China; 2. Nanjing Design Research Institute, China Coal International Project Group, Nanjing 210000, China
Abstract:The long term mainterm maintenance freezing air shaft of Yangliu Coal Mine lasted 104 days, which is the first example in our country. This article introduces the measures for long- term freezing, which have receivd good result and provides experience for the well freezing project.
Keywords:long - term maintence  freeze - up engineering  practice