首页 | 本学科首页   官方微博 | 高级检索  
     

厦门石鼓山立交H匝道桥的加固与施工方案
引用本文:苏永定. 厦门石鼓山立交H匝道桥的加固与施工方案[J]. 福建建筑, 2014, 0(9): 84-86
作者姓名:苏永定
作者单位:中铁第一勘察设计院集团有限公司厦门分公司,福建厦门361012
摘    要:厦门石鼓山立交近年来交通量剧增,桥梁超载情况比较严重。动静载试验发现H匝道桥主梁应变及挠度实测值偏大,且5号桥台一侧的板式橡胶支座出位偏移较严重。通过在桥梁跨中增加支撑,和对支座进行纠偏等桥梁加固措施,增大了梁体的线刚度,减少了跨中负弯矩。加固后对桥梁进行结构验算,结构是安全的。

关 键 词:桥梁加固  动静载试验  支座纠偏  结构验算

Reinforcement and construction program of Xiamen Shigu Mountain Interchange H Ramp Bridge
SU Yongding. Reinforcement and construction program of Xiamen Shigu Mountain Interchange H Ramp Bridge[J]. Fujian Architecture & Construction, 2014, 0(9): 84-86
Authors:SU Yongding
Affiliation:SU Yongding (China Railway First Survey and Design Institute Group Co. , Ltd. Xiamen branch,Xiamen 361012 )
Abstract:In recent years, Xiamen Shigu Mountain Interchange surge in traffic, Bridges overload situation is more serious. Found by static load test, H ramp bridge strain and deflection of the main beam measured value is too large,and the 5th laminated rubber bearing out -migration of more serious side abutment. By increasing support in the bridge midspan, and carry on bearing corrective measures, such as bridge strengthening,the stiffness of the beam is increased and the negative bending moment of midspan is reduced. After checking the structural reinforcement of the bridge, the structure is safe.
Keywords:Bridge strengthening  Static Load Test  Supports correction  Structure checking
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号