首页 | 本学科首页   官方微博 | 高级检索  
     

高海拔直流线路绝缘子人工污秽试验方法
引用本文:张福增,赵锋,杨皓麟,王黎明,关志成,文华,马仪. 高海拔直流线路绝缘子人工污秽试验方法[J]. 中国电机工程学报, 2009, 29(13): 99-103
作者姓名:张福增  赵锋  杨皓麟  王黎明  关志成  文华  马仪
作者单位:1.清华大学深圳研究生院
2.云南电力试验研究院(集团)有限公司
基金项目:“十一五”国家科技支撑计划重大项目(2006BAA02A19)。
摘    要:为对直流线路绝缘子人工污秽试验方法导则的制定和高海拔地区直流线路外绝缘设计提供参考,在1 970 m实际为试品,在人工雾室中对其不同人工污秽试验方法进行对比高海拔条件下,分别以大吨位钟罩型瓷绝缘子和复合绝缘子研究。试验结果表明不同试验方法下的直流闪络电压有一定的差异:瓷和复合绝缘子浸污法试验结果稍低于定量涂刷法(小于5%);瓷和复合绝缘子的升压法试验中,在1.5~3.6 kV/s范围内,升压速度对试验结果影响不大(4%之内);但升压法试验结果明显高于恒压升降法,并随着盐密的增大两者的差值逐渐增加。

关 键 词:高海拔  直流线段  绝缘子  人工污秽  试验方法
收稿时间:2008-05-15

Artificial Pollution Experimental Method for Outdoor Insulation of DC Transmission Lines at High Altitudes
ZHANG Fu-zeng,ZHAO Feng,YANG Hao-lin,WANG Li-ming,GUAN Zhi-cheng,WEN Hua,MA Yi. Artificial Pollution Experimental Method for Outdoor Insulation of DC Transmission Lines at High Altitudes[J]. Proceedings of the CSEE, 2009, 29(13): 99-103
Authors:ZHANG Fu-zeng  ZHAO Feng  YANG Hao-lin  WANG Li-ming  GUAN Zhi-cheng  WEN Hua  MA Yi
Affiliation:1. Graduate School in Shenzhen, Tsinghua University
2. Yunnan Electric Power Test and Research Institute (Group) Co., Ltd
Abstract:At present, some different artificial pollution experimental method have been recommended to investigate the flashover performance in IEC document and correlative standards, however, there is no any research about the difference among their results. In order to provide a reference for drafting the guide of artificial pollution experimental methods for dc insulators and for designing outdoor insulation of dc transmission lines, this paper compared the flashover characteristics of 300kN Bell-type porcelain insulators and composite insulator under different artificial experimental methods in natural high altitude areas (1970 m). Experimental results indicated that the flashover voltage for porcelain and composite insulator with Immerging- Solution-Method was lower than that with Brush-Method for less than 5%. The voltage rise rate has no obvious effect on experimental results for porcelain insulator and composite insulator within 1.5~3.6kV/s. Test results with rise-voltage method are much higher than that with up-and-down method and the difference becomes larger with the increase of equivalent salt deposit density.
Keywords:high altitude  DC line  insulator  artificial pollution  experimental method
点击此处可从《中国电机工程学报》浏览原始摘要信息
点击此处可从《中国电机工程学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号