首页 | 本学科首页   官方微博 | 高级检索  
     

高寒地区高速铁路箱梁预制冬期施工措施
引用本文:李熙福.高寒地区高速铁路箱梁预制冬期施工措施[J].山西建筑,2011,37(18):69-71.
作者姓名:李熙福
作者单位:中铁十三局集团第二工程有限公司,广东,深圳,518083
摘    要:通过对兰新二线门源制梁场冬期施工措施的研究,重点阐述了高寒地区冬期施工的各项温度要求、冬期施工措施、冬季施工热工计算的方法,以指导实践.

关 键 词:高寒地区  冬期施工  混凝土  温度  热工计算

Prefabrication winter of construction measures of alpine region high-speed railway girders
LI Xi-fu.Prefabrication winter of construction measures of alpine region high-speed railway girders[J].Shanxi Architecture,2011,37(18):69-71.
Authors:LI Xi-fu
Abstract:Through analysing winter of construction measures of Menyuan system beam field for Lan-Xin second-line,emphasis elaborated the various temperature requirements of prefabrication winter of construction,winter of construction measure,winter construction thermal calculation method,so as to guide practice.
Keywords:alpine region  winter of construction  concrete  temperature  thermal calculation  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号