Simultaneous optimization of repair and control-limit policy in condition-based maintenance |
| |
Authors: | Sayyideh Mehri Mousavi Hesam Shams Shahrzad Ahmadi |
| |
Affiliation: | 1.Department of Industrial Engineering,Tafresh University,Tafresh,Iran;2.Industrial and Systems Engineering Department,University of Tennessee,Knoxville,USA;3.Industrial Engineering Department,University of Houston,Houston,USA |
| |
Abstract: | In condition-based maintenance (CBM) planning, collected information from system condition monitoring is the basis of making decision about conducting the maintenance and repair activities. Recently, ample number of studies has been conducted in CBM field especially, in control-limit policy. In control-limit policy, using proportional Hazards model and results of monitoring system condition, one can estimate hazard rate function and its condition’s transition probability matrix. Then, considering replacement costs, optimal control-limit can be determined minimizing the average cost in the long run. The presented model considers repair policy and their implementation cost, and the assumptions of repair during interval inspection is ignored. Then, a model is presented to determine the optimal control-limit and the best repair policy, in which the average total cost per unit time in the long-run, is minimized. At the end, a numerical example is illustrated. |
| |
Keywords: | |
本文献已被 SpringerLink 等数据库收录! |
|