首页 | 本学科首页   官方微博 | 高级检索  
     

某半埋—全埋式大截面箱涵施工技术
引用本文:李建平,李方志.某半埋—全埋式大截面箱涵施工技术[J].山西建筑,2010,36(12):303-304.
作者姓名:李建平  李方志
作者单位:1. 南省漯河市交通局,河南,漯河,462000
2. 中国土木工程集团有限公司,北京,100038
摘    要:详细介绍了一个作为某双层公路桥和地铁隧道之间过渡结构的大截面箱涵的施工技术,在箱涵基坑开挖的过程中采用了施工桥,便于在有两层水平支撑的基坑内实施开挖作业,箱涵主体分两阶段施工,保证了工程质量。

关 键 词:箱涵  公路  大截面

The construction technology of a partly-fully buried heavy-section box culvert
LI Jian-ping,LI Fang-zhi.The construction technology of a partly-fully buried heavy-section box culvert[J].Shanxi Architecture,2010,36(12):303-304.
Authors:LI Jian-ping  LI Fang-zhi
Affiliation:LI Jian-ping LI Fang-zhi
Abstract:This paper deals with the construction technology of a partly-fully buried box culvert which is a transition structure between a two-deck bridge and a underground tunnel.For the purpose of excavation of the foundation ditch with two-story lateral bracing,an accessory bridge was adopted as a working platform.The main structure was constructed in two-steps which contributed to good quality.
Keywords:box culvert  highway  heavy-section
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号