拉斗铲作业实体高台阶安全稳定性研究
引用本文:王忠强,张瑞新,张勇,吴多晋,陈德付. 拉斗铲作业实体高台阶安全稳定性研究[J]. 中国矿业大学学报, 2010, 39(2)
作者姓名:王忠强  张瑞新  张勇  吴多晋  陈德付
作者单位:1. 中国矿业大学资源与安全工程学院,北京,100083
2. 中国矿业大学资源与安全工程学院,北京,100083;国家安全生产监督管理总局通信信息中心,北京,100013
3. 国家安全生产监督管理总局通信信息中心,北京,100013
基金项目:国家重点基础研究发展计划(973计划) 
摘    要:采用极限平衡法和FLAC3D数值模拟法对不同高度、坡面角、载荷情况下,以及岩石台阶下留不同宽度的煤柱等状态下,拉斗铲作业实体高台阶的安全稳定性进行了系统地研究.用赤平极射投影法确定黑岱沟露天煤矿拉斗铲作业实体高台阶的破坏形式为楔形体单面滑动和楔形体双面滑动.研究成果经现场实际应用证明,黑岱沟露天煤矿拉斗铲作业实体高台阶采用高38m、坡面角65°、留4m煤柱的参数是安全稳定和合理可行的.

关 键 词:拉斗铲作业实体高台阶  楔形体  极限平衡法  安全系数

A Study of the Safety and Stability of a High Solid Bench Used in Dragline Works
WANG Zhong-qiang,ZHANG Rui-xin,ZHANG Yong,WU Duo-jin,CHEN De-fu. A Study of the Safety and Stability of a High Solid Bench Used in Dragline Works[J]. Journal of China University of Mining & Technology, 2010, 39(2)
Authors:WANG Zhong-qiang  ZHANG Rui-xin  ZHANG Yong  WU Duo-jin  CHEN De-fu
Affiliation:WANG Zhong-qiang1,ZHANG Rui-xin1,2,ZHANG yong3,WU Duo-jin1,CHEN De-fu1(1. Faculty of Resources & Safety Engineering,China University of Mining & Technology,Beijing 100083,China,2. Communication , Information Center,State Administration of Work Safety,Beijing 100013,3. Heidaigou Surface Coal Mine,Zhunge'er Energy Co Ltd. Shenhua Group,Zhunge'er,Inner Mongolia 010300,China)
Abstract:FLAC3D numerical simulation and equilibrium limit methods were used to analyze the stability and safety of a high,solid bench used in dragline operations. The effects of changing bench height,slope angle and load were examined. The safety factor associated with different widths of the remaining coal-pillar was analyzed. The Heidaigou surface coal mine has high solid benches used with dragline operations. Destruction of these benches by single-or double-side sliding was examined by a stereographic projection...
Keywords:FLAC3D  high solid bench on which dragline works,wedge  limit equilibrium method  FLAC~(3D)  safety factor