南沙某电厂顶管施工方法及技术措施
引用本文:赖丹云,谢伟.南沙某电厂顶管施工方法及技术措施[J].广东水利电力职业技术学院学报,2009,7(4).
作者姓名:赖丹云  谢伟
作者单位:1. 广东省电力设计研究院,广东广州,510663
2. 广东省供水工程管理总局,广东广州,510635
摘    要:通过番禺区某工程顶管技术的应用实践,总结出顶管法在火力发电厂循环水自流引水管中的施工方法。

关 键 词:顶管  施工技术  质量保证措施

Construction Method and Technology Measure for Pipe Tacking in A Certain Power Plant in Nansha
LAI Dan-yun,XIE Wei.Construction Method and Technology Measure for Pipe Tacking in A Certain Power Plant in Nansha[J].Journal of Guangdong Technical College of Water Resources and Electric Engineering,2009,7(4).
Authors:LAI Dan-yun  XIE Wei
Affiliation:LAI Dan-yun,XIE Wei(1.Guangdong Electric Power Design Institute,Guangzhou 510663,China,2.Water Resources Department of Guangdong Province,Guangzhou 510635,China)
Abstract:Through the application of pipe jacking technology to a certain engineering project,the construction method of pipe jacking technology is summarized in circulating water natural flowpipe of power plant.
Keywords:pipe jacking  construction technology  quality guarantee measure  