摘    要:文章介绍了2~#高炉环缝洗涤系统核心设备的安装调整过程,介绍了保证环隙元件的对接精度的方法及各部分元件的安装难点。

关 键 词:2#高炉  环缝洗  核心设备  安装调整
文章编号:1009-5438(2005)06-0014-03
修稿时间:2005年7月15日

Installation and adjustment of ring gap washing equipment of Baogang No. 2 Blast Furnace
NIE Zhen-gang,MA Jun-ping.Installation and adjustment of ring gap washing equipment of Baogang No. 2 Blast Furnace[J].Science & Technology of Baotou Steel(Group) Corporation,2005,31(6):14-16.
Authors:NIE Zhen-gang  MA Jun-ping
Abstract:The process of installation and adjustment of the core equipment in the gas washing system of No.2 Blast Furnace of Baogang is introduced and the accuracy of the inter-connection of ring gaps elements and the difficult points in those installations are also discussed in the paper.
Keywords:No  2 Blast Furnace  ring gap washing  core equipment  installation and adjustment  