热电联产项目设计接口管理
引用本文:康慧.热电联产项目设计接口管理[J].沈阳电力高等专科学校学报,2011(2):117-119.
作者姓名:康慧
作者单位:中国电力工程顾问集团公司,北京100120
摘    要:对热电联产项目设计接口进行管理,是一种简单有效、可操作性强的管理方式,是提高热电联产项目综合设计质量的重要措施之一,值得建设方和设计单位注意.介绍了热电联产项目在设计上的特点,以及设计接口的内容和要点,并提出了设计接口管理措施.

关 键 词:设计接口  建设方  设计合同  设计联络会  接口文件

Design Interface Management of Combined Heat and Power Project
KANG Hui.Design Interface Management of Combined Heat and Power Project[J].Journal of Shenyang Electric Power Institute,2011(2):117-119.
Authors:KANG Hui
Affiliation:KANG Hui(China Power Engineering Consulting Corporation,Beijing,100120,China)
Abstract:Design interface management of Combined Heat and Power(CHP) project is worthy of drawing construction and design units' attention,with the character of simple,effective and highly operational.This paper covers the design feature of CHP project,as well as the content and key point of design interface.Management measures of design interface are also proposed.
Keywords:design interface  construction unit  design contract  design liaison meeting  interface document