首页 | 本学科首页   官方微博 | 高级检索  
     

高台漫流区铁路桥涵洪灾预警雨量分析
引用本文:秦军,李盛,华永利,盛世勇,蔡磊,余云燕. 高台漫流区铁路桥涵洪灾预警雨量分析[J]. 水力发电学报, 2022, 41(4): 71-82. DOI: 10.11660/slfdxb.20220408
作者姓名:秦军  李盛  华永利  盛世勇  蔡磊  余云燕
作者单位:兰州交通大学 土木工程学院,兰州 730070;中国铁路兰州局集团有限公司 工务部,兰州 730030
基金项目:国家自然科学基金;国家自然科学基金;甘肃省基础研究创新群体项目
摘    要:为降低漫流区水害对兰新铁路桥涵的危害,利用暴雨洪水管理模型(SWMM)对高台漫流区洪水进行模拟分析,得到该漫流区部分铁路桥涵预警雨量.首先通过ArcGis建立集总式与半分布式两种SWMM模型,用6场降雨对模型参数进行率定,利用精度评价指标比较两种模型的优劣,进而探讨了SWMM模型对漫流区的适用性;最后采用水位反推法,得...

关 键 词:漫流区  暴雨洪水管理模型  降雨径流  水文模型  预警雨量

Analysis on flood warning rainfall for railroad bridges and culverts in Gaotai overflow area
QIN Jun,LI Sheng,HUA Yongli,SHENG Shiyong,CAI Lei,YU Yunyan. Analysis on flood warning rainfall for railroad bridges and culverts in Gaotai overflow area[J]. Journal of Hydroelectric Engineering, 2022, 41(4): 71-82. DOI: 10.11660/slfdxb.20220408
Authors:QIN Jun  LI Sheng  HUA Yongli  SHENG Shiyong  CAI Lei  YU Yunyan
Abstract:This article presents a flood simulation analysis using Storm Water Management Model (SWMM) to reduce water damage to the bridges and culverts of Lanzhou-Xinjiang Railway in the Gaotai overflow area and to determine the warning rainfall for some of these culverts. First, we construct two types of SWMMs, namely lumped and semi-distributed types, using the software ArcGis, and compare their pros and cons through calibration and accuracy evaluation for the simulations of six rainfall events. Then, the applicability of SWMM to the overflow area is discussed; finally, flood warning rainfalls are determined using a water level inversion method. The results show SWMM is applicable to the rainfall-runoff in this overflow area, with relative flood level errors less than 10% and a determination coefficient greater than 0.7. Of the six rainfall events, four are simulated with an accuracy reaching the level of Class A standard, and two reaching Class B, resulting in a qualification rate of 100%. Lumped hydrological models are better for application to the overflow area than the semi-distributed type. For a given disaster water level, a longer warning time means a greater warning rainfall.
Keywords:overflow area  storm water management model  rainfall-runoff  hydrological model  warning rainfall  
本文献已被 万方数据 等数据库收录!
点击此处可从《水力发电学报》浏览原始摘要信息
点击此处可从《水力发电学报》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号