浅谈龙滩水电站机电安装总进度计划编制的体会
引用本文:金德才.浅谈龙滩水电站机电安装总进度计划编制的体会[J].四川水力发电,2006,25(5):4-6.
作者姓名:金德才
作者单位:四川二滩建设咨询有限公司,四川,成都,610021
摘    要:简要介绍了大型水电站机电安装工程总进度计划编制需要考虑的几个重点问题、进度计划提前实施需要研究和落实的几项相关工作以及进度计划的更新与实施。

关 键 词:龙滩水电站  机电安装  总进度计划  编制与实施
文章编号:1001-2184(2006)05-0004-03
收稿时间:2006-07-13
修稿时间:2006年7月13日

Preparation of Overall Schedule for Electrical and Mechanical Equipment Installationat Longtan Hydropower Station
JIN De-cai.Preparation of Overall Schedule for Electrical and Mechanical Equipment Installationat Longtan Hydropower Station[J].Sichuan Water Power,2006,25(5):4-6.
Authors:JIN De-cai
Abstract:Main issues about preparation of overall schedule for electrical and mechanical equipment installation at large-scaled hydropower stations are briefly presented.Some relevant work necessary to be studied and carried out for executing schedule ahead of time are described.Updating and implementation of the schedule are given.
Keywords:Longtan hydropower station  electrical and mechanical equipment installation  overall schedule  preparation and execution