摘    要:重点阐述了李家峡水电站3# 机组下机架与推力轴承安装过程, 以及为达到设计要求, 对变形控制所采取的工艺措施

关 键 词:机组  下机架  推力轴承  安装

Research on the installation of mounting rack beneath No.3 unit and thrust bearing
WANG Quan jin,XU Jin zhong. Research on the installation of mounting rack beneath No.3 unit and thrust bearing[J]. Advance of Power System & Hydroelectric Engineering, 1999, 0(3)
Authors:WANG Quan jin  XU Jin zhong
Abstract:The process of installing the mounting rack beneath No.3 unit and thrust bearing of Lijiaxia Hydropower Station is introduced, and the measures to control the process in order to achieve the design standard is also mentioned.