首页 | 本学科首页   官方微博 | 高级检索  
     

某综合楼的结构优化设计与施工
引用本文:付志文.某综合楼的结构优化设计与施工[J].安徽建筑,2007,14(5):55-55,57.
作者姓名:付志文
作者单位:安徽置地投资有限公司,安徽,合肥,230001
摘    要:文章以某综合楼的结构优化设计为例,主要介绍了柱下交叉条形基础大体积混凝土的施工要点。实践证明,该方案的实施,不仅提高了施工的安全性,缩短了施工工期,而且降低了工程成本,取得了较好的经济效益。

关 键 词:结构优化  人工挖孔桩  柱下交叉条形基础
文章编号:1007-7359(2007)05-0055-02
修稿时间:2007-07-09

Optimized Structural Design and Construction of a Complex Building
Fu Zhiwen.Optimized Structural Design and Construction of a Complex Building[J].Anhui Architecture,2007,14(5):55-55,57.
Authors:Fu Zhiwen
Affiliation:Anhui Land, Hefei 230001. China
Abstract:Taking the optimized structural design in a complex building as an example, the article introduces the essentials in the cross strip foundation mass concrete construction. Practice proved that this scheme has enhanced safety, shortened construction period as well as lowered engineering cast, achieved good economic benefit.
Keywords:optimized structural design  manual-excavated pile  cross strip foundation
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号