首页 | 本学科首页   官方微博 | 高级检索  
     


Scheduling railway traffic at a construction site
Authors:Peter Brucker  Silvia Heitmann  Sigrid Knust
Affiliation:1.Fachbereich Mathematik/Informatik, Universit?t Osnabrück, Albrechtstra?e 28, 49069 Osnabrück, Germany (e-mail: {peter,sheitman,sigrid}@mathematik.uni-osnabrueck.de),DE
Abstract:We consider the problem of rescheduling trains in the case where one track of a railway section consisting of two tracks in opposing directions is closed due to construction activities. After presenting an appropriate model for this situation we derive a polynomial algorithm for the subproblem of finding an optimal schedule with minimal latenesss if the subsequences of trains for both directions outside the construction site are fixed. Based on this algorithm we propose a local search procedure for the general problem of finding good schedules and report test results for some real world instances. Received: December 8, 1999 / Accepted: May 2, 2001
Keywords:: Scheduling –  Railway –  Local search
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号