首页 | 本学科首页   官方微博 | 高级检索  
     

高压直流接地极过压保护反事故措施的仿真研究
引用本文:郭琦,韩伟强,周红阳,余江,张楠,冯鸫,蔡永梁,卢世才. 高压直流接地极过压保护反事故措施的仿真研究[J]. 南方电网技术, 2009, 3(3): 35-38
作者姓名:郭琦  韩伟强  周红阳  余江  张楠  冯鸫  蔡永梁  卢世才
作者单位:1. 南方电网技术研究中心,广州,510623
2. 中国南方电网电力调度通信中心,广州,510623
3. 中国南方电网超高压输电公司,广州,510620
摘    要:利用RTDS仿真系统分析了高肇直流输电系统“4·2”双极相继闭锁事故原因,指出现有接地极过压一开路59EL保护的设计逻辑存在缺陷,在中性母线开关跳开的情况下会出现不合适的动作出口,导致双极相继闭锁事故。通过仿真验证了拉开极线高压侧隔离开关隔离极线可以有效消除在中性母线上耦合的过电压;在中性母线开关跳开后通过合理增加59EL保护延时同时隔离故障极线路是针对“4·2”双极闭锁事故的有效反事故措施。

关 键 词:高压直流输电  双极闭锁  接地极过压保护  RTDS仿真
收稿时间:2009-04-03

RTDS based Study on the Anti-Fault Strategies of HVDC Electrode Over-Voltage Protection
GUO Qi,HAN Wei-qiang,ZHOU Hong-yang,YU Jiang,ZHANG Nan,FENG Dong,CAI Yong-liang and LU Shi-cai. RTDS based Study on the Anti-Fault Strategies of HVDC Electrode Over-Voltage Protection[J]. Southern Power System Technology, 2009, 3(3): 35-38
Authors:GUO Qi  HAN Wei-qiang  ZHOU Hong-yang  YU Jiang  ZHANG Nan  FENG Dong  CAI Yong-liang  LU Shi-cai
Affiliation:CSG Technology Research Center, Guangzhou 510623, China;;CSG Technology Research Center, Guangzhou 510623, China;;CSG Power Dispatching & Communication Center, Guangzhou 510623, China;;CSG Power Dispatching & Communication Center, Guangzhou 510623, China;;CSG EHV Corporation, Guangzhou 510620, China;CSG EHV Corporation, Guangzhou 510620, China;CSG EHV Corporation, Guangzhou 510620, China;CSG EHV Corporation, Guangzhou 510620, China
Abstract:The "4·2"one-by-one bipolar block fault of Gaopo-Zbaoqing HVDC is analyzed with the RTDS simulation system, and it is argued that there is a logic defect in the design of 59EL (the electrode over-voltage protection). Due to the logic defect, the 59EL will be tripping incorrectly in the case of the HSNBS (High Speed Neutral Bus Switch) opening, resulting in the one-by-one bipolar block. Simulations in this paper validate that the over-voltage can be removed effectively by isolating the fault pole after the HSNBS opening, and thus an effective anti-fault strategy for the "4·2" fault is to properly increase the delay time of 59EL after the tripping of HSNBS and to isolate the fault pole at the same time.
Keywords:HVDC   bipolar blocked   electrode over voltage protection   RTDS simulation
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《南方电网技术》浏览原始摘要信息
点击此处可从《南方电网技术》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号