海水泵房土石方开挖及大围堰施工回顾
引用本文:陈曝之,严文康. 海水泵房土石方开挖及大围堰施工回顾[J]. 核科学与工程, 2003, 23(3): 211-213
作者姓名:陈曝之  严文康
作者单位:秦山第三核电有限公司,浙江,海盐,314300
摘    要:着重说明海水泵房临海的大围堰工程是厂区土石方开挖和厂房施工的先决条件之一。外方设计方案偏离厂址实际情况 ,存在许多施工难题。中方根据厂区实际情况 ,提出新的施工方案 ,不仅保证了1 998年 6月 8日第一罐混凝土施工 ,还节约了几百万资金

关 键 词:海水泵房  大围堰  施工方案
文章编号:0258-0918-(2003)03-0211-03
修稿时间:2003-04-07

Review of the earthwork for seawater pump room and the construction of big cofferdam
CHEN Pu zhi,YAN Wen kang. Review of the earthwork for seawater pump room and the construction of big cofferdam[J]. Chinese Journal of Nuclear Science and Engineering, 2003, 23(3): 211-213
Authors:CHEN Pu zhi  YAN Wen kang
Abstract:The fact that the project of big cofferdam facing the ocean for the pump room is one of prerequisites for the site earthwork and the building constructions was significanthy shown in the paper. The design scheme provided by foreign party not exactly conforming with actual conditions resulted in many construction problems. Based on the site condition, Chinese party proposed new construction schemes, which not only ensured the first concrete pouring of the project on June 8, 1998, but also saved several million funds.
Keywords:seawater pump room  big cofferdam  constraction scheme