首页 | 本学科首页   官方微博 | 高级检索  
     

全断面掘进机推进液压缸推压力的确定
引用本文:张梅军,杨小强.全断面掘进机推进液压缸推压力的确定[J].工程机械,1999,30(8):9-10.
作者姓名:张梅军  杨小强
作者单位:工程兵工程学院
摘    要:全断面掘进机工作时的运动主要由推进液压缸推动机身的前进运动和旋转电机带动刀盘的转动组成,掘进机推进压缸的推压力是确定掘进机推进液压缸缸数和液压缸大小的主要设计参数,也是确定掘进机工作中推进力大小的依据。本文对常用的液压缸推压力公式作了修正。

关 键 词:全断面掘进机  掘进机  推压力  液压缸

Determination of the Thrust of Crowd Cylinder on Whole-section Tunneler
Zhang Meijun et al.Determination of the Thrust of Crowd Cylinder on Whole-section Tunneler[J].Construction Machinery and Equipment,1999,30(8):9-10.
Authors:Zhang Meijun
Affiliation:Zhang Meijun et al
Abstract:The movement of whole-section tunneler is composed of forward movement of tunneler body pushed by the crowd cylinder and rotational movement of disk-cutter driven by the rotating motor. The thrust of crowd cylinder on tunneler is the main design parameter to determine the number and dimension of crowd cylinder on tunneler and the basis to determine propelling force of tunneler work. Commonly used equations of cylinder thrust are revised in the article.
Keywords:Whole-section tunneler  Tunneler  Thrust Pressure of cylinder  
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号