运用满堂支架进行连续箱梁现浇施工
引用本文:孔祥平.运用满堂支架进行连续箱梁现浇施工[J].山西建筑,2003,29(1):68-69.
作者姓名:孔祥平
作者单位:中铁十三局集团有限公司四处
摘    要:对满堂支架设计与施工、预留拱度、地基处理及预压试验、沉降观测等方面进行了技术分析和总结,并进行了实效效果分析,预防了连续箱梁现浇施工中梁体因不均匀下沉而产生开裂的问题,节约了工程成本。

关 键 词:满堂支架  连续箱梁  现浇  地基处理
文章编号:1009-6825(2003)01-0068-02
修稿时间:2002年10月13

Cast-in-place construction technology of continuous box beam with full framing
KONG Xiang-ping.Cast-in-place construction technology of continuous box beam with full framing[J].Shanxi Architecture,2003,29(1):68-69.
Authors:KONG Xiang-ping
Abstract:The design and construction of full framing, prepared arch degree, foundation treatment, pre-compression experiment, observation settlement and so on are analyzed and summarized. And the experiment effect analysis is also done. Adopting full framing for cast-in-place continuous box beams can prevent the problems of uneven settlement and crack occurrence in the construction of continuous box beam and save the project cost.
Keywords:full farming  continuous box beam  cast-in-place  foundation treatment  