首页 | 本学科首页   官方微博 | 高级检索  
     

高心墙堆石坝填筑施工过程实时监控系统研发与应用
引用本文:崔博,胡连兴,刘东海.高心墙堆石坝填筑施工过程实时监控系统研发与应用[J].中国工程科学,2011,13(12):91-96.
作者姓名:崔博  胡连兴  刘东海
作者单位:天津大学水利工程仿真与安全国家重点实验室,天津,300072
基金项目:国家自然科学基金创新研究群体科学基金(51021004);国家自然科学基金(50879056)
摘    要:文章针对高心墙堆石坝填筑施工特点,建立了过程控制指标体系,确定了过程监控方法,提出了解决方案,研制开发了具有实时性、高精度、自动化、全天候等特点的大坝填筑施工过程监控系统,实现土石料上坝运输过程、坝面填筑碾压过程的实时监控。该系统应用于亚洲第一高土石坝———糯扎渡心墙堆石坝的施工现场,建立了以监控系统为核心的施工过程控制体系,对大坝填筑施工的主要环节实现精细化的全天候实时监控,有效地控制了大坝填筑施工参数,提高了施工过程的质量控制水平与效率。

关 键 词:高心墙堆石坝  填筑施工过程  实时监控  上坝运输  填筑碾压  研发与应用
收稿时间:2011/9/16 0:00:00
修稿时间:2011/10/19 0:00:00

Development and application of the real time monitoring system for filling construction process of high core rock fill dam
Cui Bo,Hu Lianxing and Liu Donghai.Development and application of the real time monitoring system for filling construction process of high core rock fill dam[J].Engineering Science,2011,13(12):91-96.
Authors:Cui Bo  Hu Lianxing and Liu Donghai
Affiliation:State Key Laboratory of Hydraulic Engineering Simulation and Safety, Tianjin University;State Key Laboratory of Hydraulic Engineering Simulation and Safety, Tianjin University;State Key Laboratory of Hydraulic Engineering Simulation and Safety, Tianjin University
Abstract:In this paper, on the basis of research on high core rock fill dam filling construction characteristics, the process control index architecture is established; the method of process monitoring is determined; the solution scheme is proposed; the monitoring system of core rock fill dam filling construction process, with the characteristics of real time, high precision, automation and all weather, is developed in order to achieve monitoring on process of transportation to dam and rolling on dam surface. The monitoring system is applied in the construction field of the highest earth rock fill dam in Asia, Nuozhadu core rock fill dam, as the core component of the construction process control architecture, achieving refining, all whether and real time control on key links of dam filling construction, which improves quality control level and efficiency of construction process.
Keywords:high core rock fill dam  filling construction process  real time monitoring  transportation to dam  rolling on dam surface  development and application
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《中国工程科学》浏览原始摘要信息
点击此处可从《中国工程科学》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号