摘    要:受施工影响,施工区河道断面变化很大,与天然河道断面状况迥然不同.通过对锦屏水电站施工区河道断面水位流量关系的计算分析,探寻了水电站施工区河道断面水位流量关系的研究方法.

关 键 词:施工区  水位流量关系  方法  探讨  锦屏水电站

Research Approach of Flow-stage Relation at River Profile in Construction Area of Hydropower Station
JIAN De-ping,DUAN Tong.Research Approach of Flow-stage Relation at River Profile in Construction Area of Hydropower Station[J].Sichuan Water Power,2008,27(Z3).
Authors:JIAN De-ping  DUAN Tong
Affiliation:JIAN De-ping DUAN Tong(Ertan Hydropower Development Company Ltd.,Chengdu,Sichuan,610021,China)
Abstract:River profile varies greatly in construction area due to construction and differs widely from natural river profile.By performing calculation and analysis on flow-stage relation at river profile in construction area at Jinping hydropower station,the research approach of flow-stage relation at river profile in construction area of hydropower station is explored.
Keywords:construction area  flow-stage relation  approach  discussion  Jinping hydropower station  