首页 | 本学科首页   官方微博 | 高级检索  
     

园子沟矿井建设总体方案优化设计
引用本文:杨怀敏,滕鑫麟,魏高巍.园子沟矿井建设总体方案优化设计[J].煤炭工程,2014,46(8):5-7.
作者姓名:杨怀敏  滕鑫麟  魏高巍
作者单位:河北工程大学
摘    要:文章围绕矿井建设期间提升和通风安全这两个重要系统,以三井筒交替装备顺序为核心,对园子沟矿井的几种总体建设方案进行了对比分析,通过方案比选,选择了最优的设计方案,达到了缩短建设工期,提高经济效益的目的。

关 键 词:矿井建设  提升系统  井筒装备  总体建设  方案优化

General construction scheme optimization design of the mine Yuan Zigou
Abstract:This essay will explore the subject of construction organization in relation to the overall plan of mine what is a significant process. While shrink the project time –limit and enhance economic performance as a target, which put emphasis on construction project optimization. It looks at the use of the two systems within the industry and explores the importance of them for ascension and ventilation safety specifically within the context of alternating with three wellbore equipment order. This article will use as a case study a number of mining projects inYuanZiGou and though contrastive analysis will aim to offer optimal solutions to the problem of scheme optimization for time in relation to this example.
Keywords:Mine construction  wellbore equipment  scheme optimization
本文献已被 CNKI 等数据库收录!
点击此处可从《煤炭工程》浏览原始摘要信息
点击此处可从《煤炭工程》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号