构皮滩水电站泄洪消能设计
引用本文:胡中平,向光红,班红艳. 构皮滩水电站泄洪消能设计[J]. 贵州水力发电, 2005, 19(2): 30-33
作者姓名:胡中平  向光红  班红艳
作者单位:长江勘测规划设计研究院,湖北,武汉,430010
摘    要:构皮滩水电站坝址河谷狭窄、洪水峰高量大, 枢纽最大泄洪功率为42 000MW, 位居国内外高拱坝工程前列, 泄洪与消能防冲设计是本工程的关键技术问题之一。通过方案比选和水工模型试验研究, 推荐采用坝身孔口泄洪、坝下设置水垫塘消能、岸边设1条泄洪洞、采用预挖冲坑挑流消能的布置方案。

关 键 词:水工结构  泄洪消能  水垫塘  泄洪洞  构皮滩水电站
文章编号:1007-0133(2005)02-0030-04
修稿时间:2004-09-08

Design of Discharge Dissipation For Goupitan Hydropower Station
HU Zhong-ping,XIANG Guang-hong,BAN Hong-yan. Design of Discharge Dissipation For Goupitan Hydropower Station[J]. Guizhou Water Power, 2005, 19(2): 30-33
Authors:HU Zhong-ping  XIANG Guang-hong  BAN Hong-yan
Abstract:The river valley at the dam site of Guopitan Hydropower Station is very narrow.The flow of its food pick is huge,its biggest discharge power is up to 42,000MW,more than ones of most high dams at home and abroad.Therefore,the design of discharge,dissipation and erosion control is one of the key technology problems of the project.Comparing several schemes and researching hydraulic model test,the layout scheme has been recommended that discharge is through orifices on the dam body and a spillway in the bank,cushion dissipater is set out under the dam,pre-excavating impact cavity and bucket dissipation are used.
Keywords:hydraulic structure  discharge dissipation  water cushion  spillway tunnel  Goupitan Hydropower Station