首页 | 本学科首页   官方微博 | 高级检索  
     

600 MW机组锅炉高压给水管道振动测试分析及治理
引用本文:李英,唐璐. 600 MW机组锅炉高压给水管道振动测试分析及治理[J]. 浙江电力, 2014, 0(9): 45-48
作者姓名:李英  唐璐
作者单位:苏州热工研究院,江苏苏州215004
摘    要:某600 MW机组高压给水管道在负荷变化过程中存在明显振动。通过现场观察和测量,结合模态分析得出,高压给水管道振动不是由于低频结构共振引起,而是变负荷过程中的流体激振力引起的振动。提出了相应的振动治理方案,新增相应的限位拉杆和阻尼器,有效地减小了高压给水管道的振动。实践表明,该治理方案可行,振动治理效果明显。

关 键 词:锅炉  高压给水管  负荷变化  振动测试  模态分析

Analysis on Feedwater Pipes Vibration Test of 600 MW Unit and the Treatment
LI Ying,TANG Lu. Analysis on Feedwater Pipes Vibration Test of 600 MW Unit and the Treatment[J]. Zhejiang Electric Power, 2014, 0(9): 45-48
Authors:LI Ying  TANG Lu
Affiliation:(Suzhou Nuclear Power Research Institute, Suzhou Jiangsu 215004, China)
Abstract:High-pressure feedwater pipes of 600 MW units were found vibrating during load change. inspection measurement and in combination with modal analysis, it is concluded pressure feedwater pipes was not caused by low-frequency resonance but by fluid change. The paper brings forward a treatment plan of adding new limit lever and that the vibration By field of high- excitation force during load damper , which effectively reduces the vibration of high-pressure feedwater pipes. It is proved by practice that the plan is feasible and the vibration treatment is significantly effective.
Keywords:boiler  high-pressure feedwater pipe  load change  vibration test  modal analysis
本文献已被 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号