西藏中波水电站库区泥石流对工程影响研究
引用本文:程英建,石豫川,石胜伟,王敬勇. 西藏中波水电站库区泥石流对工程影响研究[J]. 长江科学院院报, 2014, 31(12): 54-58. DOI: 10.3969/j.issn.1001-5485.2014.12.011
作者姓名:程英建  石豫川  石胜伟  王敬勇
作者单位:1.中国地质调查局 地质灾害防治技术中心, 成都 610081; 2.中国地质科学院 探矿工艺研究所,成都 610081; 3.成都理工大学 地质灾害防治与地质环境保护国家重点实验室, 成都 610059;4.中国水电顾问集团 华东勘测设计研究院, 杭州 310014
基金项目:“十二五”国家科技支撑计划项目,中国地质调查局资助项目
摘    要:中波水电站位于西藏昌都地区玉曲河下游河段,经调查库区内共发育8条较大泥石流沟谷,是影响水电站施工与运营安全的地质隐患之一。在分析泥石流发育地质环境背景的基础上,评价了各沟泥石流危险程度,并着重从泥石流入汇堵江、冲击淤埋和水库淤积3个方面讨论了其工程影响。研究成果表明①库区泥石流沟不具备堵江的入汇条件;②泥石流百年内输砂总量301.77万m3,仅占水库总库容的1.125%;③须重点关注近坝的扎拉沟,泥石流危险性大,直接威胁枢纽区施工安全。研究成果对水工设计方案确定和防灾减灾都具有实际的工程意义。

关 键 词:中波水电站  玉曲河   库区泥石流   发育特征   危险性  工程影响  
收稿时间:2013-08-19
修稿时间:2014-12-05

Engineering Influence of Debris Flows in the Reservoir Area of Zhongbo Hydropower Station in Tibet
CHENG Ying-jian , SHI Yu-chuan , SHI Sheng-wei , WANG Jing-yong. Engineering Influence of Debris Flows in the Reservoir Area of Zhongbo Hydropower Station in Tibet[J]. Journal of Yangtze River Scientific Research Institute, 2014, 31(12): 54-58. DOI: 10.3969/j.issn.1001-5485.2014.12.011
Authors:CHENG Ying-jian    SHI Yu-chuan    SHI Sheng-wei    WANG Jing-yong
Affiliation:1.Technical Center for Geological Hazard Prevention and Control, CGS, Chengdu 610081, China;2.Institute of Exploration Technology, CAGS, Chengdu 610081, China; 3.State Key Laboratory ofGeo-hazard Prevention and Geo-environment Protection, Chengdu University of Technology,Chengdu610059, China; 4.Power China Huadong Engineering Corporation Limited, Hangzhou 310014, China
Abstract:Zhongbo hydropower station is located in the lower reaches of the Yuqu River, Qamdo of Tibet. Investigation shows that 8 large debris flow gullies develop in the reservoir area. By analyzing the geological environment of debris flows, we assessed the risk degree of debris flows. We also analyzed the impacts of debris flows on the project in detail, such as river blocking, collision siltation and reservoir sedimentation. Results suggest that (1) none of the debris flows have confluence conditions for blocking rivers; (2) the total sediment of debris flows will reach 3,017,700 m3 in the later century, accounting for 1.125% of the total reservoir capacity; (3) we should focus on the Zhala gully near the dam because it has high risk of debris flow and directly threatens the construction safety in the hydro-junction area.The research results are of practical significance for hydraulic design and disaster prevention.
Keywords:Zhongbo hydropower station  Yuqu River  reservoir debris flow  development feature  risk degree  engineering influence
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《长江科学院院报》浏览原始摘要信息
点击此处可从《长江科学院院报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号