首页 | 本学科首页   官方微博 | 高级检索  
     

新安江水电站水轮机主轴的焊接
引用本文:关健,姚秀珍,闫海滨,朱艳. 新安江水电站水轮机主轴的焊接[J]. 焊接, 2002, 0(4): 35-37
作者姓名:关健  姚秀珍  闫海滨  朱艳
作者单位:哈尔滨电机厂有限责任公司,150040
摘    要:通过对新安江水电站增容改造的9号机组的主轴结构及其焊接工艺研究,设计了合理的焊接坡口,制定了可行的工艺方案,通过实施该工艺,主轴焊接一次成功,为以后同类结构的大轴焊接积累了经验。

关 键 词:水电站 水轮机 主轴 焊接
修稿时间:2002-01-15

WELDING OF MAIN SHAFT OF HYDRAULIC TURBINE IN XINANJIANG HYDRAULIC POWER STATION
Harbin Electrical Machinery Works Co. Ltd Guan Jian,Yao Xiuzhen Yan Haibin,Zhu Yan. WELDING OF MAIN SHAFT OF HYDRAULIC TURBINE IN XINANJIANG HYDRAULIC POWER STATION[J]. Welding & Joining, 2002, 0(4): 35-37
Authors:Harbin Electrical Machinery Works Co. Ltd Guan Jian  Yao Xiuzhen Yan Haibin  Zhu Yan
Abstract:In this paper,the construction of main shaft in Xinanjiang Hydraulic Power Station Extension Unit No 9 is presented. Meanwhile the proper welding groove and welding procedure scheme is introduced. The successful welding has acquired the experience welding of similar large shaft.$$$$
Keywords:hydraulic turbine   main shaft   welding procedure
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号