首页 | 本学科首页   官方微博 | 高级检索  
     

黄河上游梯级水库群调水调沙潜力初步研究
引用本文:武连洲,白 涛,李 强,金文婷,黄 强.黄河上游梯级水库群调水调沙潜力初步研究[J].水资源与水工程学报,2016,27(6):130-133.
作者姓名:武连洲  白 涛  李 强  金文婷  黄 强
作者单位:(1.西安理工大学 西北旱区生态水利工程国家重点实验室培育基地, 陕西 西安 710048; 2.中国电建集团贵阳勘测设计研究院有限公司, 贵州 贵阳 550000)
基金项目:国家自然科学基金项目(51409210、51179149、51190093); 水利部公益性行业科研专项经费项目(201501058)
摘    要:利用水库群开展水沙调控是解决黄河上游泥沙淤积的有效措施之一。以1956~2010年长系列来水、来沙资料为准,分析了黄河上游沙漠宽谷河段的水沙规律和调控时机,以龙羊峡、刘家峡水库(龙刘)为调控手段,在以水定电模式下建立黄河上游梯级水库群联合调度模型。在3种情景下求解模型可知:(1)黄河上游调水调沙14、30 d的最大需水量分别是32×10~8和67×10~8m~3;(2)定量给出了梯级水库群的调水调沙潜力,调水调沙14 d的周期为2年1次,调水调沙30 d的周期为3年1次;研究成果对黄河上游沙漠宽谷河段河道水沙调控以及梯级水库群科学调度具有重要的指导意义和应用价值。

关 键 词:调水调沙潜力  联合调度  以水定电  可调水量  梯级水库

Research on potential of water and sediment regulation of cascade reservoir group in upper reaches of Yellow river
WU Lianzhou,BAI Tao,LI Qiang,JIN Wenting,HUANG Qiang.Research on potential of water and sediment regulation of cascade reservoir group in upper reaches of Yellow river[J].Journal of water resources and water engineering,2016,27(6):130-133.
Authors:WU Lianzhou  BAI Tao  LI Qiang  JIN Wenting  HUANG Qiang
Abstract:The regulation of water and sediment by use of cascade reservoir group is one of the most effective ways to solve the serious situation of sediment deposition in the upper reaches of Yellow River. Based on the long series data of water and sediment from 1956 to 2010, this paper analyzed the law of water and sediment,and regulation time in the desert starch reaches.Longyangxia and Liujiaxia cascade reservoirs are chosen as the regulation mean.Under the mode of water resources determining power generation, this paper established the joint operation model of cascade reservoirs in the upper reaches of Yellow River.Then three scenarios are set and the results showed that (1) the maximum water demand for 14 and 30 days of water and sediment regulation in the desert starch reaches are 3.2 billion m3and 6.7 billion m3 respectively; (2) the paper gave the potential of water and sediment regulation by cascade reservoir group in quantity, the cycles of one water and sediment regulation for 14 is two years and that for 30 days is three years. The research has important guiding significance and application value for the regulation of water and sediment and the optimization operation of cascade reservoir group in the desert starch section of upper reaches of Yellow river.
Keywords:potential of water and sediment regulation  jiont operation  power generation decided by water resources  transferable water  cascade reservoir
本文献已被 CNKI 等数据库收录!
点击此处可从《水资源与水工程学报》浏览原始摘要信息
点击此处可从《水资源与水工程学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号