首页 | 本学科首页   官方微博 | 高级检索  
     


Scheduling problem for hot-rolling seamless steel tube production
Affiliation:HUO Jiazhen~(1)),LILin~(1,2)) and LI Hu~(1)) 1) School of Economics and Management TongJi University,Shanghai 20009,China 2) School of Business,East China University of Science and Technology,Shanghai 200237,China
Abstract:Taking the seamless tube plant of Baoshan Iron & Steel Complex in China as the background,we analyze the characters of hot rolling seamless steel tube:multi varieties,low volume,complicated production process,flexible production routes.Then integrated scheduling problem for hot rolling seamless steel tube production is studied,which covers two key points;order-grouping problem and solution method for flowshop/jobshop scheduling problem.On the basis of these two problems,integrated scheduling decision system is developed.The design idea,function flow sheet,data processing method,and functional module of visualized human-computer interactive scheduling system implemented in seamless steel tube plant of Shanghai Baoshan Iron & Steel Complex are described into detail.Compared with manual system,the performance of system shows the applicability and superiority in several criteria.
Keywords:hot-rolling seamless steel tube  production scheduling problem  order-grouping problem  decision system
本文献已被 CNKI 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号