110 kV三相共筒式GIS同频同相交流耐压试验中隔离开关断口击穿特性仿真分析
引用本文:秦逸帆,牛铮,孙云生,郑一博,宁琳如,吴昊天,李学宝. 110 kV三相共筒式GIS同频同相交流耐压试验中隔离开关断口击穿特性仿真分析[J]. 中国电力, 2021, 54(7): 117-124. DOI: 10.11930/j.issn.1004-9649.201912075
作者姓名:秦逸帆  牛铮  孙云生  郑一博  宁琳如  吴昊天  李学宝
作者单位:1. 国网冀北电力有限公司电力科学研究院,北京 100045;2. 国网冀北电力有限公司,北京 100032;3. 华北电力大学,北京 102206
基金项目:国网冀北电力有限公司本部管理科技项目(52010117000M)
摘    要:同频同相交流耐压试验技术因无需母线全停,现已在220 kV GIS设备检修或扩建后的绝缘性能试验中得到了广泛应用.然而,110 kV变电站普遍采用三相共筒式GIS设备,由于相间紧凑布置,在对三工位隔离开关进行耐压试验时,隔离开关断口击穿风险较大,这将给系统供电可靠性带来极大影响.使用EMTP-ATP仿真软件搭建了同频同...

关 键 词:GIS设备  同频同相  交流耐压试验  击穿故障
收稿时间:2019-12-13
修稿时间:2020-02-20

Simulation Analysis of Breakdown Characteristics in Isolation Switch Fracture in Same Frequency and Phase AC Withstand Voltage Test of 110 kV Three-Phase Cylindrical GIS
QIN Yifan,NIU Zheng,SUN Yunsheng,ZHENG Yibo,NING Linru,WU Haotian,LI Xuebao. Simulation Analysis of Breakdown Characteristics in Isolation Switch Fracture in Same Frequency and Phase AC Withstand Voltage Test of 110 kV Three-Phase Cylindrical GIS[J]. Electric Power, 2021, 54(7): 117-124. DOI: 10.11930/j.issn.1004-9649.201912075
Authors:QIN Yifan  NIU Zheng  SUN Yunsheng  ZHENG Yibo  NING Linru  WU Haotian  LI Xuebao
Affiliation:1. State Grid Jibei Electric Power Research. Institute, Beijing, 100045, China;2. State Grid Jibei Electric Power Co., Ltd., Beijing, 100032, China;3. North China Electric Power University, Beijing, 102206, China
Abstract:The same frequency and phase AC withstand voltage test technology has been widely used in the insulation performance test of inspection or expansion in 220kV Gas Insulated Switchgear (GIS), which can avoid stopping running grid bus of the system. However, the technology has been promoted in the withstand voltage test of GIS equipment with 110 kV voltage level. The three-phase cylindrical structure is generally adopted in 110 kV GIS devices. Due to the small inter-phase space, the switch has a higher risk of breakdown when the three-station disconnecting switch is subjected to the withstand voltage test. In this paper, the EMTP-ATP simulation software is used to construct the breakdown model of 110 kV GIS equipment in the same frequency and phase AC withstand voltage test. The fault voltage and current characteristics of the same phase and wrong phase is obtained. The influence of the installation protection resistances on the breakdown characteristics is analyzed, and the suggestions for suppression of the breakdown characteristics are given. This paper can provide useful references for the application of the same frequency and phase technology in the AC withstand voltage test of 110 kV GIS equipment.
Keywords:GIS equipment  same frequency and phase  AC withstand voltage test  breakdown  