Signaling System No.7 local exchange deployment |
| |
Authors: | Cambron GK |
| |
Affiliation: | Pacific Bell, San Ramon, CA; |
| |
Abstract: | The author examines the deployment of Signaling System No.7 (SS7) from the viewpoint of the local exchange carrier. The three phases of local exchange deployment-service planning and design, local exchange network design, and interconnection design-are discussed in sequence. SS7 is a fundamental change to the infrastructure of the local exchange telecommunications network. The author describes how the backbone network, centered on the signaling transfer points (STPs), is installed first, followed by the local exchange network, and then interconnection to interchange and other networks |
| |