大型高炉混凝土框架冬期负温施工 |
| |
引用本文: | 周云麟,洪斌.大型高炉混凝土框架冬期负温施工[J].低温建筑技术,1996(4):11-12. |
| |
作者姓名: | 周云麟 洪斌 |
| |
摘 要: | 从冬施原理出发,对裸露系数较大的高炉砼框架的冬期施工过程进行了统筹考虑,提出了满足砼防冻剂选用,预养护,施工过程与措施、拆模强度控制等的综合蓄热施工方法。最终取得了较好的技术经济效果。
|
关 键 词: | 含水率 防冻剂掺量计算 彼奥准则 临界成熟度 |
CONSTRUCTION OF BLAST FURNACE CONCRETE FRAME IN WINTER |
| |
Abstract: | With general consideration of the concrete frame of blast furnace with a big surface coefficient in winter construction, a comprehensive thermos methods had been taken, which included the choose of anti—freezing admixture, concrete curing, construction process and measures, as well as strength control of form removal. Therefore, a satisfied result was obtained. |
| |
Keywords: | Water content calculating the amount of antifreezing admixture critical maturity |