首页 | 本学科首页   官方微博 | 高级检索  
     

核电站循环水虹吸出水设计
引用本文:阎丽静,李晓爱.核电站循环水虹吸出水设计[J].广东水利水电,2014(7):19-23.
作者姓名:阎丽静  李晓爱
作者单位:深圳中广核工程设计有限公司,广东深圳518000
摘    要:滨海核电站循环水采用淹没式虹吸管双重出流设计,在保证CC虹吸井合理水位控制基础上,对压力主流道、无压辅助流道及排水暗涵处采取了消能、减泡、拦泡、消涡等措施,并结合外海拦截和化学加药消泡系统,从而使CC出水不仅满足凝汽器真空度要求而且解决了排水泡沫问题。

关 键 词:核电站  循环水  虹吸出水设计  泡沫治理

Design of Circulating Water Siphon Outlet for Nuclear Power Station
YAN Lijing and LI Xiaoai.Design of Circulating Water Siphon Outlet for Nuclear Power Station[J].Guangdong Water Resources and Hydropower,2014(7):19-23.
Authors:YAN Lijing and LI Xiaoai
Affiliation:(China Nuclear Power Design Company Ltd, (Shenzhen), Shenzhen 518057, China)
Abstract:The stubttletged siphon double flow has been adopted in nuclear power station at the side of sea, which ensured the water level in CC well under control to maintain the appropriate vacuum degree of condenser. The measurements have been taken to eliminate the foam in the main flow with pressure and auxiliary flow as well as buried drainage culvert, such as the energy dissipation, bubble blockage, bubble elimination and burble deceasing. The above measurements in combination with chemical reagent addition and obstruction meshwork in sea successfully solved the CC foam problem.
Keywords:nuclear power station  circulating water  siphon outlet design  elimination to foam
本文献已被 维普 等数据库收录!
点击此处可从《广东水利水电》浏览原始摘要信息
点击此处可从《广东水利水电》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号