建井期立井排水系统方案设计 |
| |
引用本文: | 陈雄.建井期立井排水系统方案设计[J].工程设计与建设,2001(5). |
| |
作者姓名: | 陈雄 |
| |
作者单位: | 铜陵有色金属集团井巷公司!安徽铜陵244000 |
| |
摘 要: | 对山东金莱矿业公司金矿主井建井期内井筒排水方案进行了总结 ,解决了建井期内如何以较经济的方法在立井内设置备用排水系统 ,以防突发涌水造成淹井事故的问题
|
关 键 词: | 立井 突发涌水 排水 备用系统 |
Scheme design of vertical shaft drainage system during shaft construction |
| |
Authors: | CHEN Xiong |
| |
Abstract: | The shaft drainage scheme during the construction period of main shaft in the gold mine of Shandong Jinlai mining Co Was summarized The stand by drainage system was installed in the shaft with more economic method,and the flooding of the shaft caused by abrupt inrush of water was thus prevented |
| |
Keywords: | vertical shaft abrupt inrush of water drainage stand by system |