侯庄分矿延深开采排水方案选择 |
| |
引用本文: | 徐坤明,程永民,林如炯.侯庄分矿延深开采排水方案选择[J].工程设计与建设,2001(4). |
| |
作者姓名: | 徐坤明 程永民 林如炯 |
| |
作者单位: | 山东金岭铁矿计划处!山东淄博255081 |
| |
摘 要: | 主要阐述 -3 4 0m延深水平接力泵房和管道配置方案 ,经比较选择开凿专用管子巷代替在现生产井筒安装管道的方案 ,保证了矿山正常生产和工程进度
|
关 键 词: | 接力排水 管子巷 深部开采 |
Selection of drainage scheme for extension mining of Houzhuang submine |
| |
Authors: | XU Kun ming CHENG Yong min LING Ru jiong |
| |
Abstract: | The arrangement scheme of the relay drainage pump room and pipelines at -340 m extension level was described. Through comparison, the scheme of drilling a special pipeline tunnel was selected instead of the scheme of installing the pipelines in the existing production shaft, and thus the normal mine production and project progress were guaranteed. |
| |
Keywords: | relay drainage pipeline tunnel deep mining |