FL-H2-L煤层气五分支水平井绒囊钻井液技术
引用本文:孟尚志,窦政辉,刘彬,孙苗苗.FL-H2-L煤层气五分支水平井绒囊钻井液技术[J].钻井液与完井液,2012,29(1):5-8,89.
作者姓名:孟尚志  窦政辉  刘彬  孙苗苗
作者单位:1. 中国煤层气有限责任公司,北京;中国地质大学(北京),北京
2. 英国富地石油控股公司,北京
3. 中国石油大学(北京),北京
基金项目:国家科技重大专项“鄂尔多斯盆地石炭-二叠系煤层气开发示范工程”(2011ZX05062)
摘    要:FL-H2-L五分支水平生产井位于鄂尔多斯盆地吕梁复背斜西翼,目的层为山西组3#、4#、5#煤层3段煤层气藏.该井一开采用膨润土钻井液,二开采用空气、清水钻井液,三开五分支水平井采用无固相绒囊钻井液,其配方为:清水+(0.3%~0.4%)定位剂+(1.0%~1.5%)成层剂+(0.2%~0.3%)强层剂+(0.1%~0.5%)成核剂+(0.1%~0.5%)成膜剂.在现场应用中,控制现场钻井液密度为0.90~0.98 g/cm3,黏度为30~50 s,通过利用绒囊钻井液的自匹配全尺寸封堵、高效携带悬浮钻屑、强力润滑减阻等优点,同时将漏失速率控制在2 m3/h以下,保证储层渗流通道畅通.通过应用该钻井液,五分支水平井段(长度分别为1 050、1 050、1 012、965和828 m)的纯钻时间为624h,平均机械钻速为7.5 m/h,该分支井的钻井周期为32 d,比设计周期(60d)缩短了28 d.

关 键 词:煤层气井  多分支井  堵漏  防止地层损害  无固相钻井液  绒囊

Fuzzy Ball Drilling Fluid Technology in CBM of Multilateral Horizontal Well FL-H2-L with Five Branch Holes
MENG Shangzhi,DOU Zhenghui,LIU Bin,SUN Miaomiao.Fuzzy Ball Drilling Fluid Technology in CBM of Multilateral Horizontal Well FL-H2-L with Five Branch Holes[J].Drilling Fluid & Completion Fluid,2012,29(1):5-8,89.
Authors:MENG Shangzhi  DOU Zhenghui  LIU Bin  SUN Miaomiao
Affiliation:Petro China Coal Bed Methane Company Limited,Beijing 100011,China
Abstract:The multilateral horizontal well FL-H2-L is located in Erdos Basin,with the pay zones of Shanxi group 3#,4#and 5* coal beds.In the first two intervals,bentonite drilling fluid,air and fresh water drilling fluid are applied each,inthe third interval,the clay-free fuzzy ball drilling fluid is applied.The formulation of that is Fresh water,Fuzzy generatedagent (0.3%-0.4%),Layer generated agent (1%-1.5%),Layer strengthened agent (0.2%-0.3%),Gas-core generated agent(0.1%-0.5%),Membrane generated agent (0.1%-0.5%).By using the fuzzy drilling fluid,the loss rate can be controlledwithin 2 m3/h,and the density covers from 0.90 g/cm3 to 0.98 g/cm3,the viscosity is from 30 seconds to 50 seconds.In thiswell,each length of the five branch holes are 1,050 m,1,050 m,1,012 m,965 m and 828 m,the whole net drilling time is 624hours,the average ROP is 7.5 m/h,and the drilling period is reduced from 60 days to 32 days compared with designed.
Keywords:CBM well  Multilateral well  Mud loss control  Formation damage prevention  Clay-free drilling fluid  Fuzzy